Design

Question: 

I am a structural engineer designing pool cage structures that are typically attached to the house at the fascia board. Sometimes, the structure is attached where trusses are behind the fascia board and other times there is a framed gable end overhang. Do you know of any information concerning this additional load on the trusses or overhang under design wind loads? Is there a limiting distance on the amount of overhang? I know trusses are designed for certain uplift and the pool cage will add to this uplift at design load, but what about the gable end overhangs?

Question: 

How important is continuous lateral bracing in roof trusses? Is it detrimental to the roof integrity if it is missing?

Question: 

I have a 29 x 72 mobile office with a 2-foot deep wooden truss above the ceiling that a client is required to sprinkler. Is there any way to avoid sprinklering above the gypboard ceiling?

Question: 

We have designed a custom home that needs a good solid floor, with low vibration perceptibility. The system we have specified consists of 2 in. of gypcrete over 1 and 1/8 in. thick plywood or OSB. The floor trusses are 20 in. deep at 16 in. O.C., spanning 31 ft. 6 in. The preliminary truss design shows a double top and bottom chord with a total load deflection of 1.30 in. (l/290) and a live load deflection of 0.65 in. (l/581). The basement ceiling will be 1/2 in. gypboard nailed to the bottom of the trusses.

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

I own and live in the middle unit of a one-story tri-plex that has a truss-framed roof. The interior has high ceilings that would potentially allow the addition of a second floor room. I am contemplating adding a shed dormer to create a second story bedroom. Do you have any suggestions as to how a shed dormer could be added? I am familiar with how to frame up a shed dormer if the original framing were rafters and a ridge board, but the truss construction has thrown me for a loop.

Question: 

Is it the responsibility of the truss manufacturer to provide a sealed layout drawing for roof trusses?

Question: 

In RC 2601, is RC-1 Channel used?

Question: 

Does SBCA have a state by state map for ground snow loads per the building code?

Question: 

What is the correct method of attaching scissors trusses to the top plate? I read recently in a trade magazine that this type of truss should be toe-nailed on one end and attached with slotted clips on the other end. According to the article, this is to allow for movement of the truss. We require PE stamped spec sheets from the truss manufacturer to verify trusses meet wind and snow loads. These sheets give bracing requirements but never give recommended attachment requirements.