Design

What are the requirements on the permanent bracing of bottom chords? Can gypsum board diaphragms be used?

What type of construction uses a fire cut truss? Could you describe a fire cut truss?

Do you have information on purlin grades and species to meet 50 psf top chord live load using 2x4s on edge 24 in. O.C. over trusses at 6 ft. O.C.?

We are finding it difficult to design permanent diagonal bracing for scissors trusses. The truss is often only a few feet in depth, which does not provide adequate room for diagonal bracing. Has SBCA come up with recommendations for permanent bracing of scissors trusses?

In our one-year-old home, as you approach the hallway, the floor slopes downward. Our home inspector said that this was most likely due to the fact that the walls were resting on the floor as opposed to being load-bearing walls. What has been your experience with sloping floors in a new home? The floors are very flat elsewhere until the walls start. Do you think this sloping could turn into a structural problem eventually?

Our home caught fire last month and burned partly through a tongue and groove ceiling to the trusses. Some are charred. Our contractor did a moisture meter test. An engineer for the insurance company said the trusses were only smoke damaged & the moisture meter test is invalid (it can be set to read anything). I found one article on charred trusses, but it’s pretty vague. We do not feel safe with the insurance engineer’s assessment because some of the trusses are obviously charred. We hired an engineer who agreed with us.

I am looking for a 1-hour roof/ceiling assembly for wood truss construction. I would like to apply the drywall directly to the bottom of the truss and also have insulation for sound control. Is this possible without using channels and what UL number would I use?

Does the NFPA sprinkler standard address sprinkler loading? If so, how and where do I buy it? What other information do you have on sprinkler loading? How do other truss companies price jobs for sprinkler loading the plans do not include a sprinkler layout or even say what size/type of sprinkler system will be used?

Some truss lumber repair nailing patterns call for 16d common nails. Most nail guns do not support 16d nails, but have an equivalent to a 12/10d nail. Is there a substitution guide or ESR report that could help us?

What are the requirements for installing “valley set” overlay roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary?