Construction

We are finding it difficult to design permanent diagonal bracing for scissors trusses. The truss is often only a few feet in depth, which does not provide adequate room for diagonal bracing. Has SBCA come up with recommendations for permanent bracing of scissors trusses?

Are there any trusses that are supported strictly by the wood itself without any mechanical connections such as brackets?

In RC 2601, is RC-1 Channel used?

What is the industry standard for ordering residential roof truss systems: Should the general contractor/builder field measure before ordering trusses or should he rely on the blueprint? Who is responsible for their accuracy – the plan service, the truss manufacturer, the builder/general contractor or the framing contractor?

I need to obtain some information on fire-retardant-treated roof trusses.

I am doing research for clients who have flat roof trusses to which they are adding a second story. We are now looking for information on the trusses to determine what their load capability is. What do you need to know to help us determine this?

What is the recommended standard spacing for open-web wood joists? I have seen them placed 24 in. O.C. Is this acceptable for a customer who will have an exercise room with 500 pounds of free weights? I understand there are problems with bouncy floors with 24 in. spacing. Is this true?

Our home caught fire last month and burned partly through a tongue and groove ceiling to the trusses. Some are charred. Our contractor did a moisture meter test. An engineer for the insurance company said the trusses were only smoke damaged & the moisture meter test is invalid (it can be set to read anything). I found one article on charred trusses, but it’s pretty vague. We do not feel safe with the insurance engineer’s assessment because some of the trusses are obviously charred. We hired an engineer who agreed with us.

The Gypsum Association “Fire Resistance Design Manual” (GA-600-12) lists file RC2601 with two layers of 5/8 in. gypsum wallboard (GWB) on wood joists.

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?