Search
What level, if any, of responsibility does a CM assume if the contractors on the jobsite use our layout plans to do more than just put the walls together? Specifically on the job in question, the panel layout was used to place plumbing for a kitchen island. Unfortunately, the layout had the pony wall for that island out of place by 11”. As a result, there is additional work needed to relocate the plumbing.
Getting information up front on sprinkler systems can ease the design process.
Most of the conversations I’ve had with component manufacturers (CMs) about increasing production efficiency inevitably focus on one thing: bottlenecks.
Changes in state laws require a fresh look at drug use policies.