For decades, SBCA Jobsite Packages have helped component manufacturers (CMs) provide handling and installation guidance to their customers with every order. These pre-assembled packages of instruction documents, attached to truss deliveries in a zippered plastic bag, are now available in a digital format.

When Mandere Construction couldn’t get the trusses it needed to frame its projects, owner John Mandere went looking for the best truss folks he could find—and hired them

Your company does it every day: load components and deliver them to jobsites. Ben Vadnais, assistant plant manager at Windsor Building Systems, has a few tips for keeping your loading and delivery operations running as smoothly and safely as possible.

If you’ve been in the truss industry for any length of time, there’s one phone call you absolutely dread receiving: “We have a problem; your trusses collapsed!”

SBCA’s library of technical design and installation best practices has been expanded over the past year to help CMs navigate a wide array of code-related challenges in their markets.

The QuickTie System is a roof and wall anchoring system consisting of wire rope and threaded studs swaged to each end. One of the threaded studs is embedded into cured concrete by inserting it into a predrilled hole and using epoxy adhesive to anchor it to the foundation. The opposite end of the wire rope with the threaded stud is extended vertically to the uppermost top of the masonry wall, inserted through a hole drilled through the wood top plate(s), and attached to a steel plate and nut that are placed on top of the top plates(s).

Question: 

Manufactured gable ends are actually frames even though they are often referred to as trusses. The webs are “studs” oriented vertically and usually spaced at 12, 16 or 24 in. O.C. The gable end frame is designed to transfer vertical loads from the roof to the continuous bearing wall below. Another way gable end frames are different from trusses placed in the interior of the structure is that frames experience perpendicular wind loads. The sheathed frame transfers the wind loads to the roof and ceiling diaphragms and vice versa.

Question: 

I'm trying to find out who the truss manufacturer was that built the trusses in my home. I was told that there is usually a stamp on the side of the bottom chord. All I found was “2400F 2.0E.” What am I looking for? The other chords only have material stamps. Can you tell me what kind of information I should be looking for to find out who the manufacturer was?

Question: 

I need to know how to repair a hole that has been drilled through a truss. In installing the wiring we improperly put the wires through the truss and now need to know the proper way to repair it.

Question: 

It is critical that permanent top chord bracing is supplied by proper nailing of the valley truss bottom chords to the carrying truss top chords, through purlins or properly installed rated roof sheathing. If the sheathing is not carried through under the valley framing, then the permanent top chord bracing must be supplied in another manner.